Last edited by Voodookinos
Thursday, April 23, 2020 | History

2 edition of Draft environmental impact statement for hydropower license found in the catalog.

Draft environmental impact statement for hydropower license

Draft environmental impact statement for hydropower license

Catawba-Wateree Hydroelectric Project, FERC project no. 2232, North Carolina and South Carolina

by

  • 327 Want to read
  • 4 Currently reading

Published by Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing in Washington, D.C .
Written in English

    Subjects:
  • Hydroelectric power plants -- Environmental aspects -- Catawba River Valley (N.C. and S.C.),
  • Environmental impact statements -- Catawba River Valley (N.C. and S.C.)

  • Edition Notes

    StatementFederal Energy Regulatory Commission.
    ContributionsUnited States. Division of Hydropower Licensing.
    Classifications
    LC ClassificationsTD195.E4 D735 2009
    The Physical Object
    Paginationxxx, 490 p. :
    Number of Pages490
    ID Numbers
    Open LibraryOL23538638M
    LC Control Number2009358516

    Nenskra Hydro Power Plant (also known as Nenskra HPP) is a proposed hydroelectric power station to be located on the southern slopes of the Central Caucasus mountains in Svaneti, Georgia.. The plant has a projected capacity of MW, and a projected average annual energy production of TWh. It is being developed by JSC Nenskra Hydro, founded in as a joint venture between Korea Water. In closing, as we stated in our Comments on the June Draft Environmental Impact Statement (FERC Accession No. ), we at Davis Hydro came upon this problem/opportunity three years ago. We wish to be the hands to do field work on habitat, and one ofthe means to support the science, for the restoration ofthese fish resources. Holtwood Dam (also Holtwood Hydroelectric Dam, Holtwood Hydroelectric Plant, McCalls Ferry Dam) is the oldest of three major dams built across the lower Susquehanna River, and the middle location of the tula-music.com was constructed as the McCalls Ferry Dam between and by the Pennsylvania Water & Power (PW&P) Company. The dam was renamed Holtwood in honor of two company tula-music.comon: Martic Township, Lancaster County / Lower .


Share this book
You might also like
Lay my burden down

Lay my burden down

New star science

New star science

Man in Control (Candlelight Ecstasy Supreme)

Man in Control (Candlelight Ecstasy Supreme)

Jedburgh Abbey

Jedburgh Abbey

Novel nucleophilic substitution reactions of p-Phenetidine derivatives.

Novel nucleophilic substitution reactions of p-Phenetidine derivatives.

Toward the flame

Toward the flame

Hot flashes

Hot flashes

Lars Saves the Day

Lars Saves the Day

Perspectives on uncertainty and risk

Perspectives on uncertainty and risk

Report on the Copepoda collected by H.M.S. Challenger during the years 1873-76

Report on the Copepoda collected by H.M.S. Challenger during the years 1873-76

Draft environmental impact statement for hydropower license Download PDF EPUB FB2

Book/Printed Material Draft environmental impact statement for hydropower license: Klamath hydroelectric project: FERC project no. Oregon and California / Klamath hydroelectric project, FERC project no. Oregon and California. Attached is the draft environmental impact statement (EIS) for the Middle Fork American River Project (No.

), located on the Middle Fork of the American River and the Rubicon River with diversions on Duncan and North and South Long Canyon Creeks. Transmittal: This draft environmental impact statement prepared by the Commission’s staff on the hydroelectric license applications filed by Southern California Edison for the existing Big Creek Projects (FERC Nos.

67, and ) is being made available to the public on or about September 12,as required by the National. Get this from a library. Draft environmental impact statement for hydropower license: El Dorado Project No. [United States. Federal Energy Regulatory Commission.

Division of Engineering and Environmental Review.]. Get this from a library. Draft environmental impact statement for hydropower license: McCloud-Pit Hydroelectric Project, FERC project no.

California. [United States. Division of Draft environmental impact statement for hydropower license book. Jun 14,  · To the Agency or Individual Addressed: Attached is the draft environmental impact statement (draft EIS) for the Bucks Creek Hydroelectric Project (FERC Project No.

), located on Bucks, Grizzly, and Milk Ranch Creeks in Plumas County, California, in. Jun 18,  · Attached is the draft environmental impact statement (draft EIS) for the proposed Mineville Energy Storage Project (No. ), that would be located in the Town of Moriah, Essex County, New York.

Attached is the draft environmental impact statement (EIS) on the application for Draft environmental impact statement for hydropower license book proposed Lassen Lodge Project (FERC Project No. ), to be located on the upper South Fork Battle Creek in Tehama County, about miles west of the town of Mineral, California.

The project would occupy no federal land or Indian reservations. Sep 30,  · Reference: Draft Environmental Impact Statement Attached is the draft environmental impact statement (draft EIS) for the proposed Bear River Narrows Project (FERC Project No. ), located in Franklin County, Idaho. This draft EIS document documents the view of.

Attached is the final environmental impact statement (EIS) for the proposed Sweetheart Lake Hydroelectric Project (No. ), which would be located. Attached is the final environmental impact statement (EIS) for the Middle Fork American River Project (No. ), located on the Middle Fork of the American River and the Rubicon River with diversions on Duncan and North and South Long Canyon Creeks.

Draft environmental impact Draft environmental impact statement for hydropower license book for hydropower license McCloud-Pit Hydroelectric Project, FERC project no.California E / Draft environmental impact statement for hydropower license book Draft environmental impact statement for hydropower license, Eagle Mountain Pumped Storage Hydroelectric Project, FERC.

Draft environmental impact statement for hydropower license Catawba-Wateree Hydroelectric Project, FERC project no. North Carolina and South Carolina Title Draft environmental impact statement for hydropower license [electronic Draft environmental impact statement for hydropower license book Catawba-Wateree Hydroelectric Project, FERC project no.

North Carolina and South Carolina. Get this from a library. Draft environmental impact statement for hydropower license, Eagle Mountain Pumped Storage Hydroelectric Project, FERC project no. California. [United States. Division of Hydropower Licensing,]. Get this from a library. Draft environmental impact statement for hydropower license: Catawba-Wateree Hydroelectric Project, FERC project no.

North Carolina and South Carolina. [United States. Division of Hydropower Licensing.;]. Final environmental impact statement application for hydropower license for the Boundary Hydroelectric Project, FERC project no.

Washington and application for surrender of hydropower license for the Sullivan Creek Project, FERC project no.Washington /. Get this from a library. Draft environmental impact statement for hydropower license: Pit 3, 4, 5 Hydroelectric Project, FERC project no.California.

[United States. Federal Energy Regulatory Commission. Division of Engineering and Environmental Review.]. EPA acknowledges the need for energy generation that does not create greenhouse gas emissions. We also value the process created by the Federal Energy Regulatory Commission (FERC) that allowed federal and state agencies, the project proponent or licensee, and many other stakeholders to contribute to the relicensing and the DEIS.

Draft environmental impact statement for hydropower license Catawba-Wateree Hydroelectric Project, FERC project no. North Carolina and South Carolina E D Final environmental impact statement for hydropower license Catawba-Wateree Hydroelectric Project - FERC project no.North and South Carolina.

FINAL ENVIRONMENTAL IMPACT STATEMENT FOR HYDROPOWER LICENSES Yadkin Hydroelectric Project—FERC Project No. Yadkin-Pee Dee River Hydroelectric Project—FERC Project No.

North Carolina Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing First Street, NE Washington, DC For the issuance of a new hydropower license for the Upper American River Project.

(UARP), the Sacramento Municipal Utility District (SMUD), as the project proponent, is the. lead agency pursuant to the California Environmental Quality Act (CEQA) of (as. amended), Cal. final environmental impact statement for hydropower license surrender office of energy projects f august e d e r a l t e n e r g y r g u l a o r y c o m m i s s i o n kilarc-cow creek hydroelectric project – ferc project no.

california federal energy regulatory commission office of energy projects first street, ne washington, dc. DEA draft environmental assessment DEIS draft environmental impact statement DHAC Division of Hydropower Administration and Compliance EPRI Electric Power Research Institute ESA Endangered Species Act FERC Federal Energy Regulatory Commission FPA Federal Power Act FWS U.S.

Fish and Wildlife Service HCMP Hydropower Compliance Management Program. FINAL ENVIRONMENTAL IMPACT STATEMENT. FOR HYDROPOWER LICENSE. Martin Dam Hydroelectric Project—FERC Project No. Attached is the final environmental impact statement (EIS) for the relicensing of the Martin Dam Hydroelectric Project (No.

), located on the Tallapoosa River in APPENDIX A—Draft License Conditions. Environmental Impact Statement (EIS) and the commitments made therein associated with tailings management. The acceptability of the risk levels has been evaluated initially through internal multi-disciplinary risk assessments including specialist external.

Mar 11,  · Traditional hydropower creates a number of adverse environmental effects, nowadays largely recognized but still in conflict with rights granted in previous era of development. The Upper Rhone River basin is heavily developed for hydropower tula-music.com by: 3.

DEC received more than 13, public comments on its Draft Supplemental Generic Environmental Impact Statement (Draft SGEIS) issued in September In response to issues raised, DEC prepared and released for public review a Revised Draft SGEIS on September 7, Environmental Impact of Small Hydro Power Plant—A Case Study.

available via license: The book examines the function of environmental impact statements as an aspect of policy. Guidelines for Preparing an Environmental Assessment for FEMA. use the findings in this EA to determine whether to prepare an Environmental Impact Statement (EIS) or a Finding of No Significant Impact (FONSI).

Purpose and Need Preliminary draft document must be submitted to FEMA for review and approval. The. An environmental impact statement (EIS), under United States environmental law, is a document required by the National Environmental Policy Act (NEPA) for certain actions "significantly affecting the quality of the human environment".

An EIS is a tool for decision making. Under the National Environmental Policy Act (NEPA), FERC must publish an environmental document to analyze the environmental impacts of any licensing decision that may have a significant impact on environmental quality.

As a practical matter, FERC publishes such a document in every proceeding for a new or amended license because there is always dispute or uncertainty about such impacts. Jul 02,  · A dditional errata submission noting corrections to the Manitoba-Minnesota Transmission Project Environmental Impact Statement (dated May 2, ) - posted June 22, Submission letter.

Project Summary - posted November 21, Letter from Environmental Approvals Branch to Clean Environment Commission dated October 3, - posted. Final environmental impact statement for hydropower relicensing Box Canyon Hydroelectric Project, FERC project no, Washington and Idaho.

Published: () Draft environmental impact statement Swan Falls Hydroelectric Project, Idaho: FERC Project No. / Published: (). A draft environmental impact statement (EIS) was prepared by Commission staff and issued on December 23,analyzing the impacts of the proposed project and alternatives to it, and setting a deadline of February 28,for comments and interventions.

Commission staff issued a final EIS on January 30, 7 hours ago · The futures of hydropower, salmon and orcas in the Pacific Northwest are at stake in the first assessment in 20 years of the environmental effects of. The Big Creek Hydroelectric Project is an extensive hydroelectric power scheme on the upper San Joaquin River system, in the Sierra Nevada of central tula-music.com project is owned and operated by Southern California Edison (SCE).

The use and reuse of the waters of the San Joaquin River, its South Fork, and the namesake of the project, Big Creek – over a vertical drop of 6, ft (1, m. Environmental conditions: FERC license conditions that require the licensee to undertake measures to protect, mitigate, and enhance environmental quality.

Environmental document: A National Environmental Policy Act document such as an environmental assessment (EA), environmental impact statement (EIS), or categorical exemption (CE).

The Federal Energy Regulatory Commission in the U.S. has prepared a draft environmental impact statement for relicensing of the MW Yuba River Development Project in California.

Yuba County Water Agency owns the Yuba River project (No. ) and filed an application for the project in April The initial FERC license for the project. Dec 19,  · Draft Environmental Impact Statement for Hydropower License Oroville Facilities FERC Project No.

Purpose of Action, Proposed Action and Alternatives 1. Page 1, footnote #8 – Table -1, Land Ownership in the Study Area (pp. ), Final Land Use.

6 hours ago · Sports > Outdoors Impact statement on Snake and Columbia dams to usher in the next chapter of how to save imperiled fisheries. Thu., Feb. 27. Environmental analysis in hydropower licensing: A model for decision making * a formal environmental impact pdf is tula-music.com confirming that a developer's environmental report is adequate, FERC staff performs the required environmental assessment.

Both draft and final impact statements are noticed in the Federal Register Cited by: 1.Sep 12,  · APA 6th Edition (scroll down for APA 7th Edition).

Grey literature is a category of resources that includes technical or research reports by government agencies, research institutes, organizations or companies, or associations.ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PROJECT PILOT LICENSE Ebook Bay Tidal Energy Project—FERC Project No. (DOE/EA) Maine Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing First Street, NE Washington, DC U.S.

Department of Energy.